← 返回论文列表 📄 下载原文 PDF  ISSCC 2017 · 10.7
ISSCC 2017Session 10 · DC-DC CONVERTERSPower Management

A 25MHz 4-Phase SAW Hysteretic DC-DC Converter with 1-Cycle APC Achieving 190ns tsettle to 4A Load Transient and Above 80% Efficiency in 96.7% of the Power Range

⚡ 本页包含 AI 生成的分析内容,仅供参考

📋 论文概要

该论文提出了一种25MHz 4相SAW迟滞DC-DC转换器,通过1周期自适应功率控制(APC)实现了190ns的4A负载瞬态建立时间,解决了现代应用处理器对高电流摆率(1A/ns)的需求以及多相转换器在轻载下的功率损耗问题。

💡 主要创新点

核心指标
190ns tsettle to 4A Load Transient, 25MHz switching frequency
重要性
发表年份
ISSCC 2017

🏷 关键词

DC-DC转换器迟滞控制负载瞬态响应

📄 原文摘要

Switching power converters with fast load transients are crucial for application processors (APs) to facilitate system-level power adaptability with high current slew rate. While current-mode hysteretic control has been popularly employed in switching converters for simple structure, robust operation and fast transient response [1], it still does not suffice for the unprecedented 1A/ns current slew rate required by modern APs [2]. Meanwhile, current slew rate can be improved by extending single-phase to multiphase operation. However, when a converter powers light load, power loss caused by added phases adversely affects the efficiency. Active phase count (APC) was thus proposed to manage the number of active phases judiciously to load by sensing average inductor current [3,4]. However, the inherent sensing delay drastically slows down the phase adding/dropping actions and degrades load transient response. On the other hand,

👥 作者与机构

Bumkil Lee, Min Kyu Song, Ashis Maity, D. Brian Ma

University of Texas at Dallas, Richardson, TX

分类:Power Management · 年份:ISSCC 2017